The employee VB has called in sick.
The first day of absence is 08.06.2021 (8 June 2021).
The sick note was received by IH.
VB called in sick until 11.06.2021 (11 June 2021). This day is the last day of their absence.
The green background signals no further reports from VB will follow, and that the sick report is thus completed.
The following shift needs to be replaced during VB's absence: d on 10.06.2021 (10 June 2021).
The red bar to the left of the shift indicates that this shift still needs to be replaced.
The employee KN has called in sick.
The first day of absence is 08.06.2021 (8 June 2021).
The sick note was received by IH.
KN is sick for the time being until 10.06.2021 (10 June 2021). On this day they will contact you again regarding an extension of their sick leave or to report being medically fit and able to return to duty. The orange background signals that the sick note has not yet been completed and that another message is to be expected from KN.
The following shift needs to be replaced during KN's absence: s on 09.06.2021 (9 June 2021).
This shift was entered by another department.
Since the employee reported sick at your department, Rostify asks you to inform the original department.